The tank will be on cinder blocks for the next few months at least. Once I figure out how to pay for it (

) I have to get some structural work done in my basment. I need to put in a new supporting beam along with two posts and footers. Plus, I've been told to get the cement floor cut out under where the tank will sit, and to have it replaced with steel reinforced concrete. I plan on having a 135 gallon sump along with the 535 gallon tank. Then there will be the weight of the stand and canopy set up, plus another 150 gallon water tank for aging water. IF the cement floor were to ever crack I would be looking at a soggy basment come our rainy winters here. So...getting the tank into house may prove to be the easy part!